• 2 min de lectura
• 2 min de lectura

As part of the investments aimed at strengthening port infrastructure, Container Terminal I (TEC I), operated by Hutchison Ports LCT, has incorporated 12 new ARTG (Automated Rubber Tired Gantry) yard cranes, state-of-the-art equipment that will contribute to increasing operational capacity, optimizing logistical efficiency, and strengthening the competitiveness of the Port of Lázaro Cárdenas.
The new cranes arrived at the Port of Lázaro Cárdenas aboard the vessel MV Xiang He Kou, from where they were unloaded for incorporation into the operations of Container Terminal I. This investment represents an important step in the modernization of the terminal and strengthens the port's capacity to more efficiently handle the sustained growth of national and international maritime trade.
Manufactured by ZPMC, the new cranes are notable for being 100% electric and incorporating remote operation technology (Remote-Controlled ARTG), features that will optimize yard maneuvers and strengthen safety standards during operations. This represents a significant environmental advance, contributing to the reduction of emissions associated with port operations and supporting sustainability and decarbonization strategies.
The National Port System Administration Lázaro Cárdenas recognizes the investments made by the companies that make up the port community, especially highlighting the strong investment and firm commitment of Hutchison Ports LCT to the technological and sustainable development of the facility. These actions not only contribute to the development of strategic infrastructure but also elevate the port's competitiveness and consolidate Lázaro Cárdenas as a world-class logistics platform, prepared to meet the demands of maritime trade with higher levels of efficiency, innovation, and sustainability.

