
Ports
Marcona Megaport: Chinese Mining Company Redefines Design of US$400 Million Project
Terminal Portuario Jinzhao Perú submitted the Third Supporting Technical Report to Senace with modifications to the original design for US$6 million. The changes include two conveyor belts with a capacity of 3,050 tons per hour, a new transfer tower, additional control booths, and a 56.72-meter retaining wall. The execution will take 39 months without altering the project's original capacity.















