• 3 min de lectura
• 3 min de lectura
DP World allocated an additional and voluntary investment to implement the Shore Power system at the South Pier of Callao Port, as part of the over US$100 million dedicated to its decarbonization strategy, which will allow container ships to connect to the electricity grid while docked.
With this infrastructure, DP World Callao becomes the first port terminal in Latin America to offer this technology for container ships using 100% renewable electricity, certified by I-REC.
The inauguration of the system was attended by the President of the Republic, Keiko Fujimori; the Minister of Transport and Communications, Rafael Rey Rey; Tiemen Meester, Global Director of Ports and Terminals Operations at DP World; Morten Johansen, Executive Vice President of Ports and Terminals Operations for the Americas at DP World; Carlos Merino, CEO of DP World in Peru, Ecuador, and Colombia; and Javier Moreira Calderón, General Manager of CMA CGM, among other executives.
During the ceremony, the first CMA CGM vessel to use the Shore Power system at DP World Callao, the CMA CGM PLATINUM, was connected. This vessel has a capacity of 13,100 TEU, a length of 335 meters, and a methanol-ready design. The vessel was built in 2025.
The implementation of the system adds to the nearly US$1,000 million invested by DP World in Peru during its 20 years of operations and is part of initiatives aimed at incorporating sustainable solutions into its port activities.
Furthermore, DP World is considering additional investments of over US$1,300 million to continue strengthening the infrastructure and expanding the capacity of the South Pier to over 4.3 million TEU annually, in response to the growth of Peruvian foreign trade.
The Shore Power system allows compatible vessels to connect to the electricity grid from land while docked, replacing the use of their auxiliary engines and reducing fuel consumption and emissions during their stay in port.
Currently, approximately 80% of the vessels arriving at Pier 3 of DP World Callao have systems compatible with this technology, which will facilitate its adoption from the start of operations.
The system will prevent the emission of over 6,300 tons of CO2e per year and reduce NOx, SOx, and particulate matter emissions generated by auxiliary engines by more than 90% during vessels' stay in port.
It will also contribute to reducing noise pollution and improving air quality in Callao.
"The commissioning of Shore Power marks a milestone for the Peruvian port system and reaffirms our commitment to the development of a more competitive and sustainable port infrastructure. At DP World Callao, we will continue to promote technologies that generate value for our clients and for the country," said Carlos Merino, CEO of DP World in Peru, Ecuador, and Colombia.

